Back to the newsroom

Portugal / Germany
07
February 2024

E-175 EP5 rotor blade arrives at test stand

ENERCON has reached another milestone in the prototype program for the new E-175 EP5. After a journey of several days by ship and heavy transport, a prototype rotor blade of ENERCON's new top model arrived at the test stand in Aurich this week. There, the 86 meter long component is now being prepared for extensive test series under the leadership of ENERCON Research and Development.

The rotor blade was produced at the ENERCON blade factory in Viana do Castelo/Portugal. There it was loaded onto the cargo ship ‘Peak Bergen’ and transported by sea to the deep sea port in Wilhelmshaven. It was then transported by road to the test stand at the company headquarters in Aurich.

Arrival of the E-175 rotor blade from Viana do Castelo (Portugal) in Wilhelmshaven (Germany).

Research & Development, Equipment Design and Logistics already used the first E-175 EP5 blade transport for a series of measurements to validate the transport concept. The test blade was equipped with various measurement technology before transportation. Among other things, sensors determine the loads acting on the component during transportation. The measurement data should provide information on whether the new transport frames, blade clamps and trailing systems developed for the E-175 EP5 blade meet their requirements.

The first E-175 blade transport has already been used to validate the transport concept.

The practicability of the transport concept was also under particular scrutiny. ‘The dimensions of the new blade are the biggest challenge for logistics,’ says Lukas Freericks from Technical Engineering & Support at ENERCON Logistics. ‘The enormous total transport length with vehicle combination requires comprehensive testing and planning of the transport route and the route expansion requirements prior to delivery to the construction site.’ During the development process, Logistics therefore simulated and tested examples of critical infrastructure such as highway junctions and carried out an analysis of suitable ship types and means of transport. The transport concept for the E-175 EP5 blade has now passed its first test.

Night-time arrival at the ENERCON R&D test stand in Aurich (Germany).

Your contact for further questions:

Felix Rehwald

Head of Corporate Communications / Spokesperson

Dreekamp 5
26605 Aurich
Germany

View CV

Contact

This is ENERCON

As a pioneer of wind energy technology and a committed supporter of the energy transition, we have specialised in developing, producing, selling and servicing onshore wind turbines. Pursuing our mission of ‘Energy for the world’, we have been championing sustainable energy generation from onshore wind since 1984. Thanks to our innovative wind turbine technology, high quality standards and many years of experience, we are one of the industry’s leading manufacturers anywhere in the world.

Latest news and topics

40 years of ENERCON
Global
28
May 2024

Ingenious product development as the basis for the company’s success

ENERCON achieved the technological breakthrough in the 1990s with the legendary E-40/500 kW. The gearless drive concept introduced for the first time with this wind turbine type still characterises ENERCON wind energy converters to this day. It also forms the basis for the new top-of-the-range model E-175 EP5 that ENERCON is currently rolling out in series production.

Learn more
News
Germany
23
November 2023

ENERCON receives test certificates for the first E-175 EP5 prototype sites

Document handover by TÜV SÜD at the Husum Wind trade fair

View details
News
Deutschland
23
November 2023

Supply agreement signed for repowering of Windpark Ihlow wind farm

WPI Repowering GmbH orders 14 ENERCON E-138 EP3 E2 wind energy converters.

View details
News
Türkiye
23
November 2023

ENERCON and KALYON Enerji sign 260 MW contract

Cooperation comprises supply & installation of 64 E-138 EP3 turbines for projects in Türkiye.

View details