Back to the newsroom
Signing of contracts for further projects with a total capacity of 110.5 MW
Polat Enerji, Türkiye's largest wind energy investors, is relying on ENERCON technology to expand its onshore projects. Recently, both sides signed contracts for a total capacity of 110.5 MW spread over three wind farms.
The contracts consider the expansion of three wind farms including Yalova/Göktepe 4 wind farm project with 17 E-160 EP5 turbines, the Kırşehir/Geycek 3 wind farm project with 2 E-160 EP5 turbines and İzmir/Ege 3 wind farm project with 2 E-82 as well as an operation and maintenance agreement (EPK) for 15 years which includes availability and spare parts guarantees for all three sites.
Relying on the experience of numerous previous projects, we support our customer with extensive site assessments to find the most efficient site layout in the challenging terrain. Besides that, we care about all questions of logistics, construction site preparation, installation and connection to the grid.
ENERCON CCO Uli Schulze Südhoff underlines the strategic priority of the Turkish market: ‘We are pleased to extend our activities together with Polat Enerji in Türkiye. Another proof that our product portfolio fits ideally the local framework and wind conditions.’
‘The latest contract signing means also advancing our technology towards more hybrid solutions together with our customer’, Arif Günyar, Regional Head CAMEA, states. ‘In the case of Göktepe wind farm, it is planned to integrate a battery storage system connected to the turbines. The cooperation with Polat Enerji can therefore serve as an example to support similar projects in the future with our portfolio.’
Neşet Özgür Cireli, Polat Energy Board Member says, ‘ENERCON wind turbines have already proven to be very reliable and robust in existing projects. Our current installed capacity is 735 MW, and 31 MW capacity extension wind farm projects are under construction. We are pleased to advance our commitment to wind energy in Türkiye together with ENERCON and to increase our total onshore capacity to 876 MW through the new projects.’
About the E-160 EP5 E2
The E-160 E2 is based on the EP5 platform and has a nominal output of 5.50 MW. It has been developed with the needs of medium to low wind sites in mind and offers an impressive array of project-specific configuration options and features. Like all ENERCON wind turbines the E-160 EP5 E2 comes with a low-maintenance direct drive allowing efficient energy production. It is available in four different hub heights.
As a pioneer of wind energy technology and a committed supporter of the energy transition, we have specialised in developing, producing, selling and servicing onshore wind turbines. Pursuing our mission of ‘Energy for the world’, we have been championing sustainable energy generation from onshore wind since 1984. Thanks to our innovative wind turbine technology, high quality standards and many years of experience, we are one of the industry’s leading manufacturers anywhere in the world.
ENERCON and long-standing customer Soler signed contract during WindEnergy Hamburg
ENERCON achieved the technological breakthrough in the 1990s with the legendary E-40/500 kW. The gearless drive concept introduced for the first time with this wind turbine type still characterises ENERCON wind energy converters to this day. It also forms the basis for the new top-of-the-range model E-175 EP5 that ENERCON is currently rolling out in series production.
Following the successful fulfilment of the 750 MW turbine delivery agreements in the first phase, the companies have taken another step towards completing the 1,000 MW project by signing a delivery agreement for the remaining 250 MW capacity.
As of 2026, top model will be available with 7.0 MW and tower of 175 metres