Turbine types
E-115 EP3
Number of turbines
14
Status
installed (2024)
Calculated capacity
Installed capacity
58.8 MW
Description
In September 2024, ENERCON APAC completed work on Phase 1 of the Shirakami project. This project comprises 14 x E-115 EP3 E3, while Phase 2 comprises a further 11 wind turbines of the same type. ENERCON has achieved an installed capacity of 1 GW with Shirakami Phase 1.